The Home Cleaning Center: Installation is Easy
The Only Product of it's type on the market
Developed for new construction and existing homes, and designed to fit in in a 16" 2' x 4' wall stud cavity.
Installation Overview
Select
a stud cavity in a central location in your home, cut an opening starting 5" above
the baseboard, 14 1/2'' wide and 71 1/2" high.
Set the Home Cleaning Center unit in the opening and install 2 thumb screws in either side. Then plug it into an adjacent 120 volt grounded wall outlet.
For a direct connection, have your electrician run a dedicated 20 amp 120 volt line to the stud cavity.
The unit protrudes only 2 1/8" at the top and 3 1/4" at the bottom making a slim line fit. It can also be installed through a closet door or surface mounted on the inside of the door. Installation time is approximately 30 to 45 minutes.